1920x700-diverse-operatives

Facilities & Accommodation

Workstream can eliminate building maintenance issues with hassle-free facilities and accommodation solutions. We offer completely self-contained and self-powered, mobile or jackleg accommodation units available in a number of different configurations:

  • Open plan offices
  • Welfare units complete with tables and benches
  • Canteen facilities
  • Serviced mains or chemical toilets, washrooms, showers and urinal blocks complete with consumables such as bio-degradable chemicals, toilet paper, air fresheners, hand towels and liquid soap (replenished as needed)
  • Combi units with toilet, hot wash and storage or office areas
  • Lighting, power and electric heating using site mains supply or optional built-in, super-silenced generators on anti-vibration mountings
  • Anti-vandal measures such as internal door hinges, five-lever (insurance approved) mortise locks, anti-jemmy system, window shutters/grilles, wheel clamps for mobile units and integral security alarms
  • Bulk-waste tanks for sites where mains sewage facilities are not available

A wide range of fixtures, fittings and furniture...

  • Bench seats
  • Canteen tables
  • Poly stacking chairs
  • Electric cookers
  • Burco boilers/hot water heater
  • Refrigerators
  • Sink units
  • Office desks, tables, chairs
  • Filing cabinets, plan chests
  • Tubular heaters with thermostat (for drying rooms)
  • Steel staircases (for jackleg stacked units)
  • Internal partitions with doors
  • Hat and coat hooks (and notice boards for office and welfare units)

Secure storage units

  • Anti-vandal steel stores and tool vaults
  • Double width doors for ease of access
  • Double security locking system to external doors
  • Skid mounting for rough ground and forklift re-positioning
  • Welded steel fitting rings to facilitate hoisting

Gatekeeper's offices

More information...

WCS Contract Site Personnel Backgrounder

Click here to view/download our Contract Site Personnel backgrounder


Click here to get Adobe Reader

Project Case Studies...

WCS Contract Site Personnel Backgrounder

Click here to view Workstream's Project Case Studies

Contact the team...

By phone: +44 (0)1280 848888
By fax: +44 (0)1280 849031
Click here to email us