1920x700-sheffield

East Riding Leisure

From Workstream Pulse, Autumn 2015

Workstream started supplying site personnel such as fixing teams, labourers and CPCS machine drivers to Billingham-based Topside FaƧade Engineering summer 2015. Among the first of the company's jobs with Topside is this BAM Construction project, being built on the former Leisure World site in Bridlington. The scheme includes swimming pools with spectator seating for about 150, changing rooms, and various health, fitness and sports facilities.